CB FlooringCornwall

Guide

Why the subfloor decides everything

Almost every flooring complaint we are called out to is not a fault with the flooring. It is a subfloor that was damp, uneven or simply not prepared.

Damp is the first thing to check

Concrete and screed hold moisture for a long time, and older Cornish properties often have solid floors laid straight on the ground with no damp-proof membrane at all. Glue a vinyl floor to a slab that is too wet and the adhesive fails, the floor lifts and there is no putting it right without taking it all up again.

A moisture test takes minutes. Where the reading is high, a liquid damp-proof membrane is applied and left to cure before anything else happens. It adds a day and it is not optional, whatever anyone else has told you.

Flat, not just level

Level means horizontal. Flat means no humps or hollows. A floor can be perfectly level and still be unusable for a glued vinyl if it has a ripple across it, because every dip will show through a 2 mm plank as a shadow in raking light.

Concrete gets a smoothing compound trowelled over it, sometimes twice, to give a flat surface for the adhesive. Timber floors get a plywood overlay screwed down at close centres, which stops the boards moving and gives a clean, flat surface.

  • Smoothing compound over concrete and existing screed
  • Plywood overlay over floorboards, screwed rather than nailed
  • Old adhesive, gripper and staples removed
  • Damp-proof membrane where the moisture reading calls for it

Floorboards move, and so does what is on them

Laying a floor straight onto old boards is asking for the joints to open. Boards flex, they cup, and the gaps between them are exactly where a thin plank will crack or a vinyl will telegraph a line. Plywood spreads the load and gives a continuous surface.

In a period property this also has to be done in a way that keeps the void beneath ventilated. Blocking airbricks to fit a floor causes damp problems that show up years later in the joists.

Acclimatisation is not a formality

Wood and, to a lesser extent, laminate need to reach the temperature and humidity of the room before they are laid. Boards brought in from a cold van and fitted the same morning will move once the room warms up, and the result is gaps in winter or a floor that lifts in summer.

We deliver in advance and leave the material in the room. It costs a day and prevents a problem that cannot be fixed afterwards.

Questions we are asked

How long does a screed take to dry?
A thin smoothing compound is usually walkable within hours and ready to floor the next day. A thicker structural screed takes far longer, roughly a day per millimetre of thickness for a traditional sand and cement screed. We will tell you what your floor needs when we quote.
Can you fit over existing tiles?
Often yes, if they are sound and well stuck down. Loose tiles come up, and the surface is then smoothed to fill the grout lines so nothing shows through. It saves the mess of a full removal where it is possible.

More guides

Free measure and quote

Samples brought to your door

Tell us the rooms and roughly the size, and Chris will bring a selection of samples to your home so you can see them in your own light, against your own walls. Measuring and quoting are free.

CallWhatsAppEmail